February 29, 2016
Day O:
Where I clean out the bathroom and find I have too much stuff!
Day 1
Where they take a truckload of trash out.
Day 5
Nothing much to see but a lot done: all the lathe and plaster is out, cabinet wall reconfigured to hold the recessed cabinets. Electrical redone. Plumbing redone. Offcie door taken out and frames, dry wall and mud done. Bathroom door and hall way had plaster removed, and pocket door frame in. Vent removed. Window frames removed and windows repaired. A million dollars spent.
Surprise: the floor between the kitchen and the bathroom is not level. Reusing the old door, and it has to be cut a bit. A few plaster dings in the kicthens from taking out the hall way wall.
House is super dusty. Still have to order tile.
cabinet wall cut and shored up
Pocket door
Windows
Day 7-13
Crazy, still going and wondering if this will ever end. Lots more done, but it is all behind wall, or under hardie board.
Floor is half done
Surround 1/2 done
Day 18… all but the door
There still are a few things left to finish…small stuff…and I have to buy counter tops